Offshore Engineering

Search this website



Malikai TLP Basic Design

Malikai TLP Basic Design

• Timeline: 2009
• Location: Sabah, East Malaysia
• Water Depth: 565m
• Operator: Shell
• Client: MMC-AMEC

Project Description:
Shell contracted MMC-AMEC for the engineering and design service on the Malikai TLP project which is located offshore Sabah in the northern portion of Block G at a water depth of 565 meters.

ODL Scope of Work:
MMC-AMEC subcontracted ODL to perform the Malikai TLP Hull structure design and analysis including: load-out, transportation and installation, design of mooring system and riser system, and tendon design and analysis.

Key Details:
Hull Sizing and Configuration.
Global Performance Analysis for TLP alone and TAD (Tender Assisted Drilling)
Model Test Support,
Preservice Engineering for TLP delivery study,
Tendon System Design,
TLP along and TAD Mooring System Design and Analysis,
Hull Scantling and global structure analysis,
Hull Marine System Design,
Riser system design and installation engineering.