Liwan 3-1 3rd Party Verification
BaJiaoTing Field: Jacket and Deck Design
PanYu 30-1 New Jacket Analysis and Design
Pontoon Barge Float–Over Installation Study
North Belut CPP Platform
Float – Over Installation Engineering Services
Pontoon Barge Float–Over Installation of BZ28–2S Field
Vyborg SSFDR Topside Float-over
FRICTION Fender Floatover Study
Talisman MOPU Stor Dry Installation
Castor WHP Jacket floatation and upending analysis
Chevron Concept selection Study
CNOOC shallow water Mooring Design Study
BaJiaoTing Field: Jacket and Deck Design
Timeline: 2005
Location: West China Sea
Water Depth: 80m
Operator: CNOOC
Client: CNOOC
Project Description:
CNOOC contacted ODL to perform the basic platform analysis and design for the deck and jacket in the BaJioaTing Field.
ODL Scope of Work:
ODL analyzed the BaJiaoTing platform for three major in-place conditions: In-Place static, Earthquake, and Fatigue.
Key Details:
Provided client with all SACS models, Structural Model Plots, Wind & Wave Calculations, and Crane Design Reactions in addition to analysis and comments from the in-place condition analysis.
Analyzed the soil data and determined the proper pile length and recommended the type of hammer to drive the 72” pile to the proper depth. Determined the jacket had a maximum fatigue life of 42 years