Liwan 3-1 3rd Party Verification
BaJiaoTing Field: Jacket and Deck Design
PanYu 30-1 New Jacket Analysis and Design
Pontoon Barge Float–Over Installation Study
North Belut CPP Platform
Float – Over Installation Engineering Services
Pontoon Barge Float–Over Installation of BZ28–2S Field
Vyborg SSFDR Topside Float-over
FRICTION Fender Floatover Study
Talisman MOPU Stor Dry Installation
Castor WHP Jacket floatation and upending analysis
Chevron Concept selection Study
CNOOC shallow water Mooring Design Study
PanYu 30-1 New Jacket Analysis and Design
• Timeline: 2007-2008
• Location: South China Sea
• Water Depth: 203m
• Operator: CNOOC
• Client: CNOOC
Project Description:
PanYu 30-1 is part of the joint development plan for the PY30-1 and HuiZhou (HZ) 21-1 oil and gas field. Located about 240 kilometers southeast of Hong Kong, the peak production of the field is expected to reach 160M ft3/day. The natural gas will be piped to an onshore gas processing terminal.
ODL Scope of Work:
ODL was contracted to complete the detailed design for the largest jacket in Asia at the time. The final jacket design to support the integrated platform weighed 16,500mt. In addition, ODL provided technical support for the construction and installation
Key Details:
Jacket configuration designs and analysis In-Place and on-bottom conditions.
Perform Jacket piling analysis and upending analysis.
Perform Jacket T&I analysis including load-out, transportation, and launch.
Provide technical support for the construction and installation supervision.