Offshore Engineering

Search this website



North Belut CPP Platform 
Float – Over Installation Engineering Services


  • Timeline: 2008
  • Location: South Natuna Sea, Indonesia
  • Water Depth: 96,5m
  • Operator: ConocoPhillips Indonesia
  • Client: ConocoPhillips Indonesia

Project Description:
The North Belut field is located in Block B of the Indonesian sector of the Natuna Sea.ODL was contracted from ConocoPhillips Indonesia to perform CPP Platform float over installation engineering services. The CPP platform weights 14,000 tons.

ODL Scope of Work:
ODL performed the float over installation engineering services.

Key Details:
Review and 3rd party verify all the installation procedures documents from the main contractor
Perform float over installation engineering analysis ( includes stand off; entry; mating; exit stage) based on the input from contractor.