Liwan 3-1 3rd Party Verification
BaJiaoTing Field: Jacket and Deck Design
PanYu 30-1 New Jacket Analysis and Design
Pontoon Barge Float–Over Installation Study
North Belut CPP Platform
Float – Over Installation Engineering Services
Pontoon Barge Float–Over Installation of BZ28–2S Field
Vyborg SSFDR Topside Float-over
FRICTION Fender Floatover Study
Talisman MOPU Stor Dry Installation
Castor WHP Jacket floatation and upending analysis
Chevron Concept selection Study
CNOOC shallow water Mooring Design Study
Project Description:
Ocean Dynamics LLC/Offshore Kinematics Inc. was awarded the float-over installation scope for the WHP platform of the Corocoro Field located in the Gulf of Paria in Venezuela.
ODL/OKI Scope of Work:
ODL performed the ‘virtual installation’ as the 'virtual' General Contractor. The Scope included the configuration design and detailed engineering of the T&I of the WHP, assistance with the procurement of all equipment and resources, the proposal detailing the modification of the deck and the jacket during the float-over installation, inspection and modification of the installation barges and offshore installation supervision.
Key Details:
Configured and developed the first pontoon barge float-over installation method in open sea.
Used temporary piles to moor the transportation and installation barges instead of mooring lines.
Utilized a large percentage of local Venezuelan content.
The project cost was significantly lower than originally budgeted.
The float-over operation only took about 2 hours from the start of the operation to the mating of the deck legs with the jacket topside.