Liwan 3-1 3rd Party Verification
BaJiaoTing Field: Jacket and Deck Design
PanYu 30-1 New Jacket Analysis and Design
Pontoon Barge Float–Over Installation Study
North Belut CPP Platform
Float – Over Installation Engineering Services
Pontoon Barge Float–Over Installation of BZ28–2S Field
Vyborg SSFDR Topside Float-over
FRICTION Fender Floatover Study
Talisman MOPU Stor Dry Installation
Castor WHP Jacket floatation and upending analysis
Chevron Concept selection Study
CNOOC shallow water Mooring Design Study
Project Description:
The project is located in the Yme field, in the Egersund Basin in the southern part of the North Sea. The water depth is 93 meters. SBM Offshore was contracted from Talisman Energy for the installation of the MOPU.
ODL Scope of Work:
ODL was contracted to simulate the compression/spring characteristics of air bags to ensure proper energy absorption during the separation of the installation barge and the MOPU. The goal is to confirm the existing air bags are sufficient.
Key Details:
Building Hamriyah Pride barge model and Sponson barge model;
Developing spring model for the air bags and confirming compression/spring characteristics of air bags to ensure proper energy absorption;
Performing Hydrodynamic motions analysis based on the criteria provided;
Performing initial installation simulations of the barge system;
Performing detailed installation simulations to verify the sizing of air bags
Developing guidelines for the required sequence of jacking and ballasting to achieve proper clearances.