Liwan 3-1 3rd Party Verification
BaJiaoTing Field: Jacket and Deck Design
PanYu 30-1 New Jacket Analysis and Design
Pontoon Barge Float–Over Installation Study
North Belut CPP Platform
Float – Over Installation Engineering Services
Pontoon Barge Float–Over Installation of BZ28–2S Field
Vyborg SSFDR Topside Float-over
FRICTION Fender Floatover Study
Talisman MOPU Stor Dry Installation
Castor WHP Jacket floatation and upending analysis
Chevron Concept selection Study
CNOOC shallow water Mooring Design Study
Project Description:
For the Oil field development, ODL designed the Castor WHP Jacket and is performing the floatation and upending analysis.
ODL Scope of Work:
ODL performed the free floatation and upending analysis with intact and damage cases.
Key Details:
Free floatation analysis of intact base case and intact cases with consideration of the CG shift;
Free floatation analysis of damage cases with consideration of the CG shift;
Upending analysis in intact base case and intact cases with consideration of the CG shift;
Upending analysis in damage cases with consideration of the CG shift;
Produced ballasting sequences of jacket upending, and proved that the jacket meets bottom clearance and is within the crane capacity.