Liwan 3-1 3rd Party Verification
BaJiaoTing Field: Jacket and Deck Design
PanYu 30-1 New Jacket Analysis and Design
Pontoon Barge Float–Over Installation Study
North Belut CPP Platform
Float – Over Installation Engineering Services
Pontoon Barge Float–Over Installation of BZ28–2S Field
Vyborg SSFDR Topside Float-over
FRICTION Fender Floatover Study
Talisman MOPU Stor Dry Installation
Castor WHP Jacket floatation and upending analysis
Chevron Concept selection Study
CNOOC shallow water Mooring Design Study
Project Description:
Dockwise was contracted by PTTEP for the transportation and float-over installation of the PPS deck in the Greater Bongkot south (GBS) field. The Greater Bongkot south (GBS) field is located about 70km to the southeast of the existing Greater Bongkot north (GBN).
ODL Scope of Work:
ODL is performing the detailed float-over engineering analysis and design for the PPS deck.
Key Details:
Management and supervision of the transportation and installation
float-over engineering analyses;
Load-out and transportation analysis for the PPS deck;
Producing float-over installation procedures;
Grillage and skid beam design and analysis. Sea fastening design and analysis;
Outfitting design and analysis;
Mooring system design and analysis.