Liwan 3-1 3rd Party Verification
BaJiaoTing Field: Jacket and Deck Design
PanYu 30-1 New Jacket Analysis and Design
Pontoon Barge Float–Over Installation Study
North Belut CPP Platform
Float – Over Installation Engineering Services
Pontoon Barge Float–Over Installation of BZ28–2S Field
Vyborg SSFDR Topside Float-over
FRICTION Fender Floatover Study
Talisman MOPU Stor Dry Installation
Castor WHP Jacket floatation and upending analysis
Chevron Concept selection Study
CNOOC shallow water Mooring Design Study
Project Description:
ODL was contracted by the CNOOC Research Center to design and develop an economical mooring solution for an octagonal-shaped FPSO and shuttle tanker to be deployed in Weizhou 11-7 field development in Weizhou Bay.
ODL Scope of Work:
ODL designed and analyzed multiple mooring systems and configurations and provided CNOOC with a recommendation for the best system.
Key Details:
Performed Frequency Domain Analysis, Time Domain Quasi-Static Analysis, and Time Domain Fully Dynamic Analysis on the FPSO and Shuttle Tanker in both fully loaded and ballasted conditions.
Designed a polyester mooring system and saved CNOOC $10.7M (compared with the cost of utilizing a more conventional Chain mooring system).
ODL provided CNOOC Research Center with detailed equipment lists, configuration drawings, and mooring installation procedures for both the polyester and chain mooring options.