Main text
Movies
Please take a look at our corporate showreel and footage of some of our projects.
Movies
CPOC Float-over installation
Dockwise successfully performed the complete transport and float-over installation of 19,000 tonne (20,944 s.ton) MDPP offshore production platform for CPOC.
Vyborg floating floatover
Dockwise was responsible for laying out and installing the mooring spread, subcontracting, engineering and the execution of the floating-float-over.” In short, total logistical project management.